5.1.2. Screw on the top using four (4)
Size 2 Screws
.
5.1.3. Make sure that each
screw
is flush with the
Cover
(see Figure 5.1.3).
5.1.4. Fasten
Sides B
and
D
with the remaining six (6)
Size 2 Screws
.
Transition Networks
®
Lan Master TM T8 Assembly Instructions
Version 1.1
Page 18
✓
Figure 5.1.2
Figure 5.1.3
Figure 5.1.4
Satisfi
Design