20
RT-SVX25C-EN
Unit Weights
WARNING
Heavy Objects!
Do not use cables (chains or slings) except as shown. Each of the cables (chains or slings) used
to lift the unit must be capable of supporting the entire weight of the unit. Lifting cables (chains
or slings) may not be of the same length. Adjust as necessary for even unit lift. Other lifting
arrangements may cause equipment or propertyonly damage. Failure to properly lift unit may
result in death or serious injury. See details below.
WARNING
Improper Unit Lift!
Test lift unit approximately 24 inches to verify proper center of gravity lift point. To avoid
dropping of unit, reposition lifting point if unit is not level. Failure to properly lift unit could
result in death or serious injury or possible equipment or property-only damage.
Rigging
Refer to
Figure 10
and
Table 1
and
Table 2
for typical unit operating weights riffing before
proceeding.
1.
Remove the shipping crate from around the unit. Do not remove the crating from the top of the
unit.
2. Rig the unit as shown in
Figure 10
. Attach adequate strength lifting slings to all four lifting
brackets in the unit base rail. Do not use cables, chains, or slings except as shown.
3. Install a lifting bar, as shown in
Figure 10
, to protect the unit and to facilitate a uniform lift. The
minimum distance between the lifting hook and the top of the unit should be 7 feet.
4. Test-lift the unit to ensure it is properly rigged and balanced, make any necessary rigging
adjustments.
5. Lift the unit and position it into place.
Figure 10. Rigging and center of gravity data