Calculate and record freeze point of the solution:________________
Systems filled
Pumps run, air bled from system
Relief valve ventilation piping installed (if applicable)
Flow balancing valves installed in leaving chilled water
Gauges, thermometers and air vents installed on both sides of evaporator
4. Wiring
Wire size per submittal and NEC 310-16
Full power available, and within utilization range
External interlocks (flow switch, pumps auxiliary, etc.)
Chilled water pump (connected and tested)
115 Vac power available for service tools (recommended)
All controls installed and connected
5. Testing
Dry nitrogen available for pressure testing
Trace gas amounts of R-134a or R-513A available for leak testing (if required)
6.
Refrigerant on job site (if nitrogen charge option, model number digit 16 = 3 or 4, is chosen)
7.
Systems can be operated under load conditions
8. Heaters
If unit was factory charged (model number digit 16 = 1 or 2),
energize heaters for 24 hours prior to start up
.
Important:
It is required that chiller heaters are energized for a minimum of 24 hours prior to start up.
Therefore, chiller should have power for this amount of time before Trane Service arrives to do start-up.
If unit has nitrogen charge (model number digit 16 = 3 or 4), contact Trane Service for unit charging prior to start-up.
9. Owner awareness
Does the owner have a copy of the MSDS for refrigerant?
Note:
Additional time required to properly complete the start-up and commissioning, due to any incompleteness of the
installation, will be invoiced at prevailing rates.
This is to certify that the Trane
®
equipment has been properly and completely installed, and that the applicable items listed above
have been satisfactorily completed.
Checklist completed by: ______________________________________________________________________________________________
Signed: _____________________________________________________________________
Date: _______________________________
In accordance with your quotation and our purchase order number __________________, we will therefore require the presence
of Trane service on this site, for the purpose of start-up and commissioning, by __________________ (date).
Note:
Minimum two-week advance notification is required to allow scheduling of the chiller start-up.
Additional comments/instructions: ____________________________________________________________________________________
_____________________________________________________________________________________________________________________
_____________________________________________________________________________________________________________________
Note:
A copy of this completed from must be submitted to the Trane Service Office that will be responsible for start-up of chiller.