RT-SVX072A-EN
51
N
No
otte
e:: Each power supply must be protected from short
circuit and ground fault conditions. To comply
with NEC, protection devices must be sized
according to the “Maximum Over current
Protection” (MOP) or “Recommended Dual
Element” (RDE) fuse size data on the unit
nameplate.
Provide grounding for the supply power circuit in the
electric heat control box.
Main Unit Power Wiring
to lists the field connection wire ranges for both the
main power terminal block (2XD1 on 20-75T units /
1XD1 on 90-130T units) and the optional main power
disconnect switch (2QB1 on 20-75T units / 1QB1 on 90-
130T units). Service Sizing Data lists the component
electrical data.
The electrical service must be protected from over
current and short circuit conditions in accordance with
NEC requirements. Protection devices must be sized
according to the electrical data on the nameplate. Refer
to the equations listed in the product catalog to
determine the following:
•
the appropriate electrical service wire size based on
“Minimum Circuit Ampacity” (MCA)
•
the “Maximum Over Current Protection” (MOP)
device
•
the “Recommended Dual Element fuse size” (RDE)
W
WA
AR
RN
NIIN
NG
G
P
Prro
op
pe
err F
Fiie
elld
d W
Wiirriin
ng
g a
an
nd
d G
Grro
ou
un
nd
diin
ng
g
R
Re
eq
qu
uiirre
ed
d!!
F
Fa
aiillu
urre
e tto
o ffo
ollllo
ow
w cco
od
de
e cco
ou
ulld
d rre
essu
ulltt iin
n d
de
ea
atth
h o
orr
sse
erriio
ou
uss iin
njju
urry
y..
A
Allll ffiie
elld
d w
wiirriin
ng
g M
MU
US
ST
T b
be
e p
pe
errffo
orrm
me
ed
d b
by
y q
qu
ua
alliiffiie
ed
d
p
pe
errsso
on
nn
ne
ell.. IIm
mp
prro
op
pe
errlly
y iin
nsstta
alllle
ed
d a
an
nd
d g
grro
ou
un
nd
de
ed
d
ffiie
elld
d w
wiirriin
ng
g p
po
osse
ess F
FIIR
RE
E a
an
nd
d E
EL
LE
EC
CT
TR
RO
OC
CU
UT
TIIO
ON
N
h
ha
azza
arrd
dss.. T
To
o a
av
vo
oiid
d tth
he
esse
e h
ha
azza
arrd
dss,, y
yo
ou
u M
MU
US
ST
T ffo
ollllo
ow
w
rre
eq
qu
uiirre
em
me
en
nttss ffo
orr ffiie
elld
d w
wiirriin
ng
g iin
nsstta
alllla
attiio
on
n a
an
nd
d
g
grro
ou
un
nd
diin
ng
g a
ass d
de
essccrriib
be
ed
d iin
n N
NE
EC
C a
an
nd
d y
yo
ou
urr llo
occa
all//
sstta
atte
e//n
na
attiio
on
na
all e
elle
eccttrriicca
all cco
od
de
ess..
The location of the electrical service entrance is
illustrated in . It is important to complete the unit
power wiring connections onto either the main
terminal block (2XD1 on 20-75T units / 1XD1 on 90-130T
units) or the factory mounted, non-fused disconnect
switch (2XD1 on 20-75T units / 1XD1 on 90-130T units).
. Refer to the diagrams that shipped with the unit for
specific termination points.
Provide proper grounding for the unit in accordance
with local and national codes.
Figure 31.
Typical field power wiring (20 to 75 ton)
_
3XD5
OR
3QB4
2XD1
OR
2QB1
Summary of Contents for IntelliPak 1
Page 161: ...RT SVX072A EN 161 N No ot te es s ...
Page 162: ...162 RT SVX072A EN N No ot te es s ...
Page 163: ...RT SVX072A EN 163 N No ot te es s ...