![TR-Electronic CEV-115 User Manual Download Page 86](http://html1.mh-extra.com/html/tr-electronic/cev-115/cev-115_user-manual_1146699086.webp)
Installation / Preparation for commissioning
TR-Electronic GmbH 2013, All Rights Reserved
Printed in the Federal Republic of Germany
Page 86 of 136
TR - ECE - BA - DGB - 0104 - 07
11/07/2018
4.3 Connection
The connection hood must first be removed from the measuring system to undertake
connection.
The two screws
(A)
are unscrewed and the hood
(B)
removed.
Supply voltage
Pin 1
0 V,
Heating
Pin 2
11-27 VDC, Heating
Pin 3
11-27 VDC, Measuring system
Pin 4
0 V, GND,
Measuring system
For the supply voltages shielded cables with twisted core pairs and with a
minimum cross section of 0.5 mm
2
have to be used !