![TQC CureView AB8000 Operating Instructions Manual Download Page 9](http://html1.mh-extra.com/html/tqc/cureview-ab8000/cureview-ab8000_operating-instructions-manual_1146598009.webp)
9 |
5.1 Installation and Operation
The instrument has to be installed in a suitable place, preferably on a sturdy
table or work area, with normal ambient temperature. Special fixings are not
required. Exhaust for non-forced expel of fumes should be present. Carefully
unpack the apparatus and the accessories and check complete supply. Place,
if necessary, a spirit level on the work surface and adjust the height of the
feet. See also chapter 9.
5.2 Preparation of Energy Connections
The instrument is equipped with a safety tested mains supply cable and may
only be connected to plug sockets with earth connection complying with
the safety regulations.
Before connecting the instrument, check whether the supply
voltage corresponds to the local supply voltage. If it does
not, the instrument must not be connected under any
circumstances.
5.3 Mains Connection
The mains connection is located at the rear of the instrument. Plug in the
female plug in the socket on the rear of the housing. The ON/OFF Switch is
located at the right hand side near the end of the instrument.
5 INSTALLATION AND ASSEMBLY
Summary of Contents for CureView AB8000
Page 2: ......
Page 28: ......
Page 30: ...30 Date Name Signature Signature Instructed by Operator list...