TOYOTA
COROLLA
2010–
TVIP V4
PROCEDURE
REMOTE ENGINE STARTER (RES)
Page 9 of 46
Issue: A 03/12/10
i)
Connect the 2P Hood Switch
Connector to the 2P Hood
Switch Harness Connector.
Place the 2P Connectors
j)
and Wire Harness Under
the Radiator Reinforcement
Brace.
CAUTION:
Wrap the Hood Latch
in a small blanket before
continuing with the Hood Switch
Harness routing.
Fig. 2-7
Side Cutters
Fig. 2-8
k) Route and Secure the Hood Switch Harness as
shown.
(3 Wire Ties)
When installing the Wire Ties be sure
•
to rotate their Rachet End under the
Radiator Reinforcement Brace as shown.