
2-13
Manifold Input Lines,
Continued
Instructions
Step Procedure
1. Install isolation valves on meter run (if using 5 or 3 way manifolds).
2.
Install manifold and tubing to meter run and
µ
FLO. (Note: Manifold to
µ
FLO fittings not supplied with
µ
FLO).
3. Leak check all connections.
Leaks in the tubing or manifold will introduce errors when calibrating IMVs.
RTD Probe Installation
The RTD measures flowing gas temperature. Procedures, presented in this Chapter, enable the user to
install the RTD into the meter run.
Figure 2–10 RTD Probe Wiring
Optionally
Supplied
Materials
•
RTD probe with 10’ of cable. Optional lengths are 15’, 25’, 30’, 40’, and 50’.
•
One (1) thermowell with 3/4” npt threads; optional threads are 1/2” and 1”.
•
Nylon tie wraps.
Materials not
Supplied
•
Customer must specify Thermowell “U” length.
•
Teflon tape
Continued on Next Page
Summary of Contents for uFLO
Page 1: ...2100890 001 AB TOTALFLOW µFLO Computer User s Manual ...
Page 6: ...iv B B Bl lla a an n nk k k P P Pa a ag g ge e e ...
Page 8: ...vi B B Bl lla a an n nk k k P P Pa a ag g ge e e ...
Page 10: ...viii B B Bl lla a an n nk k k P P Pa a ag g ge e e ...
Page 14: ...xii B B Bl lla a an n nk k k P P Pa a ag g ge e e ...
Page 16: ...1 2 FLO 6213 Figure 1 1 µFLO 6213 Dimensions ...
Page 18: ...1 4 Figure 1 3 Bottom View µFLO 6213 9 367 9 992 8 647 Figure 1 4 Bottom View µFLO 6210 ...
Page 39: ...2 9 FLO 6213 Figure 2 7 µFLO 6213 Wall Mounted ...
Page 50: ...2 20 Figure 2 13 Mounting AC Charger ...
Page 60: ...3 10 B B Bl lla a an n nk k k P P Pa a ag g ge e e ...
Page 62: ...3 12 B B Bl lla a an n nk k k P P Pa a ag g ge e e ...
Page 64: ...3 14 B B Bl lla a an n nk k k P P Pa a ag g ge e e ...
Page 70: ...4 6 11 9 5 4 1 13 3 FLO 6210 12 8 7 10 2 Figure 4 2 µFLO 6210 Component Cable Locations ...
Page 71: ...4 7 1 6 FLO 6213 5 13 3 2 4 7 8 10 9 12 11 Figure 4 3 µFLO 6213 Component Cable Locations ...
Page 132: ...6 2 B B Bl lla a an n nk k k P P Pa a ag g ge e e ...