![Total Control Systems 700-LP Series Installation, Operation & Maintenance Manual Download Page 9](http://html1.mh-extra.com/html/total-control-systems/700-lp-series/700-lp-series_installation-operation-and-maintenance-manual_1138832009.webp)
Page 9
Direction of Flow
The meter is set up at the factory for left to right flow. To change the meter to right to left flow, begin
by removing the screws (#9 on the Meter Assembly Breakdown) and the adjuster cover plate (#7) on the
front of the meter. Remove both the screws (#1), the drive shaft retainer (#10), the drive shaft (#3), the e
-ring (#4) and the face gear (#5). Reinstall the gear on the shaft with the gear teeth facing up. Snap the
e-ring back into place to hold the gear in place. Reinstall the shaft, mating the face gear with the drive
gear of the packing capsule assembly. Reinstall the screw and cover plate. The meter will now be set
up for right to left flow. See Page 14 for a parts breakdown of entire meter assembly.
Summary of Contents for 700-LP Series
Page 10: ...Page 10 Meter Dimensions in Inches Millimeters...
Page 14: ...Page 14 700 20 LP Meter Assembly...
Page 16: ...Page 16 730 20 LP Vapor Eliminator Assembly...
Page 18: ...Page 18 720 20 LP Strainer Assembly...
Page 20: ...Page 20 757 20 LP Differential Valve Assembly...
Page 22: ...Page 22 782 20 LP In Line Check Assembly...
Page 45: ...Page 45 Page 45 NOTES...
Page 46: ...Page 46 Page 46 NOTES...