DISASSEMBLY INSTRUCTIONS
B2-5
Fig. 2-15-A
NOTE
In case of the Pinch Roller Cam and Main Cam
installation, install them as the circled section of Fig. 2-
15-B so that the each markers are met. (Refer to Fig.
2-15-B)
Fig. 2-15-B
2-15:
Remove the E-Ring
1
, then remove the Main Cam.
Remove the E-Ring
2
, then remove the Pinch Roller
Cam and Joint Gear.
1.
2.
MAIN CAM/PINCH ROLLER CAM/JOINT GEAR
(Refer to Fig. 2-15-A)
1
Main Cam
Pinch Roller Cam
Joint Gear
2
1.
Pinch Roller Cam
Main Cam
Marker
2-16: LOADING GEAR S/T UNIT (Refer to Fig. 2-16-A)
1.
2.
Remove the E-Ring
1
and remove the Main Loading
Gear.
Remove the Main Rod, Tension Lever, Loading Arm S
Unit and Loading Arm T Unit.
1
Main Rod
Main Loading Gear
Tension Lever
Loading Arm T Unit
Loading Arm S Unit
Fig. 2-16-A
2-14: CAPSTAN DD UNIT (Refer to Fig. 2-14-A)
Remove the Capstan Belt.
Remove the 3 screws
1
.
Remove the Capstan DD Unit.
1.
2.
3.
• Screw Torque: 4
±
0.5kgf•cm
Capstan DD Unit
Capstan Belt
1
1
1
In case of the Capstan DD Unit installation, apply the
silicon bond (TSE3843-W) on the position Fig. 2-14-B
correctly. (If no silicon bond applied, abnormal noise will
be heard on the deck operation.)
(Refer to Fig. 2-14-B, C)
NOTE
1.
Fig. 2-14-A
Fig. 2-14-B
Fig. 2-14-C
Capstan DD Unit
Main Chassis
Applied position of
silicon bond
Be careful not to apply the silicon
bond to the Pinch Roller.
Silicon Bond
Summary of Contents for SD-22VB
Page 111: ......