– 65 –
2 , 7
3 , 4 , 5 , 6
<Wireless remote controller>
Procedure
1
2
3
4
5
6
7
Description
Turn on power of the air conditioner.
The operation is not accepted for 5 minutes when power has been turned on at first time after installation,
and 1 minute when power has been turned on at the next time and after. After the specified time has
passed, perform a test operation.
Push [
Start/Stop
] button and change the operation mode to [
COOL
] or [
HEAT
] with [
Mode
] button.
Then change the fan speed to [
High
] using [
Fan
] button.
Test cooling operation
Test heating operation
Set temperature to [18°C] using [
Temperature set
]
Set temperature to [30°C] using [
Temperature set
]
button.
button.
After checking the receiving sound “Pi”, immediately
After checking the receiving sound “Pi”, immediately
push [
Temperature set
] button to set to [19°C]
push [
Temperature set
] button to set to [29°C].
After checking the receiving sound “Pi”, immediately
After checking the receiving sound “Pi”, immediately
push [
Temperature set
] button to set to [18°C].
push [
Temperature set
] button to set to [30°C].
Then repeat the procedure
4
→
5
→
4
→
5
.
After approx. 10 seconds, all the display lamps on the sensor part of wireless remote controller, [
Operation
]
(Green), [
Timer
] (Green), and [
Ready
] (Orange) flash and the air conditioner starts operation.
If the lamps do not flash, repeat the procedure
2
and after.
After the test operation, push [
Start/Stop
] button to stop the operation.
<Outline of test operation from the wireless remote controller>
Test cooling operation:
Start/Stop
→
18°C
→
19°C
→
18°C
→
19°C
→
18°C
→
19°C
→
18°C
→
(Test operation)
→
Start/Stop
Test heating operation:
Start/Stop
→
30°C
→
29°C
→
30°C
→
29°C
→
30°C
→
29°C
→
30°C
→
(Test operation)
→
Start/Stop