
No.
Part name
Procedure
Remarks
9
PMV coil
1. Detachment
1) Carry out works of 1 of
1
and
3
.
2) While pulling the coil upward and
removing the spring which pinches the
copper pipe, take off the coil from PMV
main body.
2. Attachment
1) Match the spring to the copper pipe
and fix it.
PMV coil
PMV main body
Spring
!
Fan guard
1. Detachment
1) Carry out works of 1 of
1
and
2
.
CAUTION
To prevent scratching on the product,
handle the product on a cardboard or
cloth.
2) Take off the discharge port cabinet and
then put on it so that the fan guard side
directs downward.
3) Take off the hooking claws (8 positions)
of the fan guard.
2. Attachment
1) Push the hooking claws (8 positions)
with hands from the front side to fix the
claws.
CAUTION
Check that all the hooking claws are fixed
at the specified positions.
Dicharge port cabinet
Fan
guard
Bell
mouth
Hooking craw
- 95 -