– 55 –
Heat insulating process
• As shown in the figure, cover the flexible hose and hose band with the attached heat insulator up to the bottom of the indoor unit without gap.
• Cover the drain pipe seamlessly with a heat insulator locally procured so that it overlaps with the attached heat insulator of the drain connecting section.
10-6. Duct design
Arrangement
Referring to the following dimensions, manufacture duct at the local site.
Ind
oor uni
t
Banding band (Locally procured)
Wrap the attached heat insulator seamlessly
from the surface of the indoor unit.
Heat insulator of the
drain connecting
section (Accessory)
Heat insulator
(Locally procured)
* Direct the slits and seams of the heat insulator
upward to avoid water leakage.
M07,10,13G3DV
M16G3DV
<Under air intake>
<Under air intake>
<Back air intake>
<Back air intake>
Summary of Contents for ras-m07g3dv-e
Page 86: ... 85 13 EXPLODED VIEWS AND PARTS LIST 13 1 Indoor Unit ...
Page 93: ......