43
(5) [
rd
] [
... FF
] will be displayed on the 7-segment display, and pump-down operation will start.
∗
To put the operation on hold midway, turn off the power supply to all the outdoor units, or push
SW05
on the
interface P.C. board.
Interface P.C. board of header unit
SW04
SW01 SW02 SW03
D600 D601 D602 D603 D604
SW05
CN30 CN31 CN32
SW15
Failed outdoor unit
Header unit
(1)
(2)
(3)
Connect liquid pipe check joint and
low pressure-side check joint using
charge hose, and purge hose of air.
.
Fully close liquid pipe service valve.
(Leave service valves of gas and
balance pipes fully open.)
If oil has degraded due to
compressor fault, undo SV3A
valve connector.
(4) Set SW01/02/03 to 2/11/1.
[rd] [... ... ... ] is displayed.
↓
Press SW04 and hold for 5 seconds or more.
(5) [rd] [ FF] is displayed (pump-down operation starts).
Behavior during pump-down operation
Outdoor uni
Behavior
Failed outdoor unit
Compressors: Turned off
Outdoor fan: ON
PMV1, PMV2 and PMV4: Open
SV2/3A/3B/3C/3D/3E/3F: ON
SV41/42/43/5/6: ON
Every other outdoor unit
Operates in test cooling
operation mode
(6) Approx. 10 minutes after the system starts up, fully close the gas pipe service valve of the failed outdoor unit.
(7) Push
SW04
of the failed outdoor unit to have pressure data (MPa) displayed.s
(The display switches each time
SW04
is pushed.)
Display Example
[
rd
] [
...11
]
Initial display
[
Pd
] [
1.20
]
High-pressure sensor output
[
Ps
] [
1.20
]
Low-pressure sensor output
[Selection of outdoor unit for pressure adjustment]
(8) Of all outdoor units operating in the pump-down mode, select the one with the lowest unit No. as an outdoor unit
for pressure adjustment.
Identifying Unit No.
The unit No. is the number displayed on the 7-segment display when SW01/02/03 are set to 1/1/1.
([
U#
] [
. . .
]: # represents the unit No.)
[Setup of outdoor units other than unit for pressure adjustment and failed unit]
(9) Leaving the balance pipes of the unit for pressure adjustment and the failed unit fully open, fully close the
balance pipe service valves of all other outdoor units.
[Setup of outdoor unit for pressure adjustment]
(10) Set
SW01/02/03
on the interface P.C. board of the outdoor unit for pressure adjustment to 1/2/2.
(11) As the low-pressure sensor output is displayed on the 7-segment display, adjust the pressure to around
0.12 MPa by slowly closing the gas pipe service valve, with checking pressure data.
(12) Compare the low-pressure sensor outputs of the failed unit with that of the unit for pressure adjustment, and
wait until the two pressure readings become almost the same. After letting the system continue operating for a
while longer, fully close the gas pipe service valve of the unit for pressure adjustment.
OUTDOOR UNIT REFRIGERANT
RECOVERY METHOD (continue)
Summary of Contents for MMY-MAP0804 Series
Page 1: ...Quick reference R410A FILE NO A11 005 ...
Page 49: ...MEMO ...
Page 50: ...MEMO ...
Page 51: ...MEMO ...
Page 52: ......