4.11 Touch pad
4 Replacement Procedures
PORTEGE M400 Maintenance Manual (960-541)
[CONFIDENTIAL]
4-35
Installing the Touch pad
The following describes the procedure for installing the touch pad. (See Figure 4-18 to 4-21.)
1.
Connect the
touch pad cable
to the connector on the touch pad and stick the
glass
tape
.
2.
Install the
touch pad
assembly
to the slot and secure it with the following
screws
.
•
M2.0
×
3.0S
S-THIN
HEAD
screw
×
2
3.
Connect the
touch pad cable
to the connector
CN3240
on the system board.
4.
Install the
touch pad cover
while engaging latches.
5.
Close the display and turn over the computer.
6.
Secure the following
screw
to fix the touch pad.
•
M2.5
×
10.0B
FLAT HEAD screw
×
1
Summary of Contents for M400 - Portege - Core 2 Duo 1.83 GHz
Page 10: ...x CONFIDENTIAL PORTEGE M400 Maintenance Manual 960 541 ...
Page 11: ... CONFIDENTIAL Chapter 1 Hardware Overview ...
Page 43: ... CONFIDENTIAL Chapter 2 Troubleshooting ...
Page 44: ...2 Troubleshooting 2 ii CONFIDENTIAL PORTEGE M400 Maintenance Manual 960 541 2 ...
Page 48: ...2 Troubleshooting 2 vi CONFIDENTIAL PORTEGE M400 Maintenance Manual 960 541 ...
Page 113: ... CONFIDENTIAL Chapter 3 Tests and Diagnostics ...
Page 114: ...3 Tests and Diagnostics 3 ii CONFIDENTIAL PORTEGE M400 Maintenance Manual 960 541 ...
Page 217: ...3 31 SETUP 3 Tests and Diagnostics PORTEGE M400 Maintenance Manual 960 541 CONFIDENTIAL 3 99 ...
Page 232: ...3 Tests and Diagnostics 3 31 SETUP 3 114 CONFIDENTIAL PORTEGE M400 Maintenance Manual 960 541 ...
Page 233: ... CONFIDENTIAL Chapter 4 Replacement Procedures ...
Page 234: ...4 Replacement Procedures 4 ii CONFIDENTIAL PORTEGE M400 Maintenance Manual 960 541 4 ...
Page 333: ... CONFIDENTIAL Appendices ...
Page 334: ...Appendices App ii CONFIDENTIAL PORTEGE M400 Maintenance Manual 960 541 ...
Page 354: ...Appendices Appendix B Board Layout B 8 CONFIDENTIAL PORTEGE M400 Maintenance Manual 960 541 ...
Page 398: ...Appendices Appendix I Reliability I 2 CONFIDENTIAL PORTEGE M400 Maintenance Manual 960 541 ...