22 I
TOSHIBA
22 I
TOSHIBA
Function check via PCB switch
Function check mode
In this mode, the functions of the 2-way valve, the 3-way valve, the mixing valve, and the circulation pump can be checked.
This process applies when the Hydrobox and outdoor unit are switched on.
Function check mode
(1) Preparation
1) Switch all remote controls for hot water supply and heating to "OFF".
2) Switch off the Hydrobox and the outdoor unit.
3) Remove the front panel of the Hydrobox.
4) Set DIP_SW705_3 to "ON".
(2) Function check
1) Switch on the Hydrobox and the outdoor unit.
2) Turn the SW700 rotary switch to position "0" and press the SW703 key switch for 5 seconds or longer.
3) Each process can be checked by turning the SW700.
4) Set DIP_SW705_3 to "OFF" to complete the process.
Rotary
switch
Check of the content
Comment
0
Not used
OP.CH
1
2-way valve
Active for approx. 2 seconds, inactive for 3 seconds
2.ON
↔
2.OFF
2
3-way valve
Active for 4 minutes (heating/cooling)
Active for 4 minutes (hot water preparation)
7-segment display
ON
→
Heating, OFF
→
Hot water 3.ON
↔
3.OFF
3
Mixing valve
Active for 30 seconds in the forward direction
Active for 30 seconds in the reverse direction
F.ON
↔
F.OFF
4
Integrated circulation pump
Active / inactive for 20 seconds
P.ON
↔
P.OFF
5
External circulation pump 2
Active / inactive for 20 seconds
P2.ON
↔
P2.OFF
6
Not used
7
Water heating backup heater
Repeat Heating 1, Heating 2 and OFF every 20 seconds
The integrated circulation pump is active.
H.ON
↔
H.OFF
8
Hot water generator
Active / inactive for 20 seconds
dH.ON
↔
dH.OFF
9
Booster heating
Active / inactive for 20 seconds
The integrated circulation pump and
external circulation pump are active.
bH.ON
↔
bH.OFF
A
Check the alarm output.
Output for 20 sec. / no output for 20 sec.
01.ON
↔
01.OFF
B
Check the boiler output.
Output for 20 sec. / no output for 20 sec.
02.ON
↔
02.OFF
C
Check the defrost output.
Output for 20 sec. / no output for 20 sec.
03.ON
↔
03.OFF
D
Check the operating output.
Output for 20 sec. / no output for 20 sec.
04.ON
↔
04.OFF
E
Not used
F
Integrated circulation pump
Continuous operation
Continuous operation
Continuous operation of the circulation
pump does not work if there is no water
in the Hydrobox.
P1.ON
↔
Flow display
FUNCTION CHECK VIA PCB SWITCH
Summary of Contents for ESTIA R32 HWT-1101F21MT6W-E
Page 1: ...APPENDIX R32 VERSION 1 0 Manual for ESTIA air to water heat pump ...
Page 3: ...8 11 14 16 h LI 1 Ph LI 1 Ph LI h LI 1 Ph LI 1 Ph LI 3 Ph 1 Ph 3 Ph 3 Ph h h 1 Ph 3 Ph 3 Ph ...
Page 8: ......
Page 26: ...26 I TOSHIBA 26 I TOSHIBA SCHEMA 1 0 ...
Page 27: ...TOSHIBA I 27 TOSHIBA I 27 SCHEMA 1 1 ...
Page 28: ...28 I TOSHIBA 28 I TOSHIBA SCHEMA 2 0 ...
Page 29: ...TOSHIBA I 29 TOSHIBA I 29 SCHEMA 2 1 ...
Page 30: ...30 I TOSHIBA 30 I TOSHIBA SCHEMA 3 0 ...
Page 31: ...TOSHIBA I 31 TOSHIBA I 31 SCHEMA 3 1 ...
Page 32: ...32 I TOSHIBA 32 I TOSHIBA SCHEMA 4 0 ...
Page 33: ...TOSHIBA I 33 TOSHIBA I 33 SCHEMA 4 1 ...
Page 34: ...34 I TOSHIBA 34 I TOSHIBA SCHEMA 5 0 ...
Page 35: ...TOSHIBA I 35 TOSHIBA I 35 SCHEMA 6 0 ...
Page 36: ...36 I TOSHIBA 36 I TOSHIBA SCHEMA 7 0 ...
Page 37: ...TOSHIBA I 37 TOSHIBA I 37 WIRING DIAGRAM 230 V ...
Page 38: ...38 I TOSHIBA 38 I TOSHIBA WIRING DIAGRAM 400V ...
Page 41: ...APPENDIX R32 VERSION 1 0 Manual for ESTIA air to water heat pump ...