20
https://www.toshiba.com/tic/
Installation and Connections
Start Up and Test
Before turning on the ASD ensure that:
• The enclosure door is closed or reattached, and
secure.
• R/L1, S/L2, and T/L3 are connected to the 3-
phase input power.
• U/T1, V/T2, and W/T3 are connected to the
motor.
• The 3-phase input voltage is within the specified
tolerance.
• There are no shorts and all grounds are secure.
• All personnel are at a safe distance away from the
motor and/or the motor-driven equipment.
DANGER
Summary of Contents for DN-68249-003
Page 1: ...ADJUSTABLE SPEED DRIVES Q9 DN 68249 003 INSTALLATION OPERATION MANUAL April 2020 ...
Page 2: ......
Page 3: ...Document Number 68249 003 April 2020 Q9 Plus ASD Installation Operation Manual ...
Page 4: ......
Page 12: ...Table of Contents Q9 Plus ASD Install Op Manual iv https www toshiba com tic ...
Page 305: ......