MOWER DECKS
7-37
Z580/Z593/Z595 Diesel Service Manual
7
6. Route the gearbox belt around the electric PTO
clutch pulley (Fig. 821).
8. Plug the clutch harness into the electric PTO clutch
plug (Fig. 823).
Fig 821
PICT-4009
Fig 823
PICT-3933
9. Install the front engine panel (Fig. 824).
7. Hook the gearbox idler spring to the frame (Fig.
822).
Fig 824
IMG_7862
Fig 822
PICT-3872
10. Install the negative battery cable to the battery.
11. Lower the seat.
Summary of Contents for Z580-D
Page 1: ...LCE Products Z580 D Z593 D Z595 D Diesel Z Master Service Manual ...
Page 3: ...THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 9: ...vi Z580 Z593 Z595 Diesel Service Manual TABLE OF CONTENTS THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 87: ...CHASSIS 3 64 Z580 Z593 Z595 Diesel Service Manual 3 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 309: ...MOWER DECKS 7 86 Z580 Z593 Z595 Diesel Service Manual 7 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 310: ...Z580 D Z593 D Z595 D Diesel Z Master Service Manual Form No 492 9188 ...