HYDRAULIC SYSTEM
4-15
Z580/Z593/Z595 Diesel Service Manual
4
30. Hook the belt alignmentn tool (Toro p/n 110-0876)
onto the engine drive sheave. Align the hydro pump
drive pulley so that the tool lies squarely within the
outer sheaves (Fig. 292).
31. Rotate the too so that it faces to the right side of the
machine. Hook the end into the hydro pump drive
pulley on the front of the engine. There is a raised
contact area on the tool. Loosen the gearbox input
pulley and locate it so the outside of the pulley just
makes contact with the raised contact area of the
tool (Fig. 293). Since the distance between the
clutch sheaves and the hydro pump drive sheave
on the engine is fi xed, the tool uses the hydro drive
sheave for reference for doing both belt alighnment
procedures.
Fig 292
hydro belt alignment
Fig 293
deck drive alignment
Summary of Contents for Z580-D
Page 1: ...LCE Products Z580 D Z593 D Z595 D Diesel Z Master Service Manual ...
Page 3: ...THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 9: ...vi Z580 Z593 Z595 Diesel Service Manual TABLE OF CONTENTS THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 87: ...CHASSIS 3 64 Z580 Z593 Z595 Diesel Service Manual 3 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 309: ...MOWER DECKS 7 86 Z580 Z593 Z595 Diesel Service Manual 7 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 310: ...Z580 D Z593 D Z595 D Diesel Z Master Service Manual Form No 492 9188 ...