HYDRAULIC SYSTEM
4-47
Z580/Z593/Z595 Diesel Service Manual
4
3. Install 2 bolts, washers and nuts to secure the reser-
voir to the hydraulic tank bracket (Fig. 393).
5. Position the hose clamp to secure the oil cooler hose
to the tank fi tting barb (Fig. 395).
Fig 393
PICT-3409
Fig 395
PICT-3396a
6. Install the hydraulic fi lter hose to the fi tting on the
bottom of the hydraulic reservoir (Fig. 396).
4. Install the oil cooler hose onto the tank fi tting on the
bottom of the hydraulic reservoir (Fig. 394).
Fig 396
PICT-3401a
Fig 394
PICT-3397a
Summary of Contents for Z580-D
Page 1: ...LCE Products Z580 D Z593 D Z595 D Diesel Z Master Service Manual ...
Page 3: ...THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 9: ...vi Z580 Z593 Z595 Diesel Service Manual TABLE OF CONTENTS THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 87: ...CHASSIS 3 64 Z580 Z593 Z595 Diesel Service Manual 3 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 309: ...MOWER DECKS 7 86 Z580 Z593 Z595 Diesel Service Manual 7 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 310: ...Z580 D Z593 D Z595 D Diesel Z Master Service Manual Form No 492 9188 ...