ENGINE
5-31
Z580/Z593/Z595 Diesel Service Manual
5
27. Slide the harness terminal onto the alternator termi-
nal and install a nut. Slide the rubber boot up over
the connection (Fig. 521).
Fig 521
PICT-3587
28. Plug the harness connector into the alternator (Fig.
522).
Fig 522
PICT-3585
29. Position the harness terminal to the oil switch and
install a screw and lock washer to secure (Fig. 523).
Fig 523
PICT-3581
30. Install a cable tie securing the harness to the sole-
noid wires (Fig. 524).
Fig 524
PICT-3576a
Summary of Contents for Z580-D
Page 1: ...LCE Products Z580 D Z593 D Z595 D Diesel Z Master Service Manual ...
Page 3: ...THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 9: ...vi Z580 Z593 Z595 Diesel Service Manual TABLE OF CONTENTS THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 87: ...CHASSIS 3 64 Z580 Z593 Z595 Diesel Service Manual 3 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 309: ...MOWER DECKS 7 86 Z580 Z593 Z595 Diesel Service Manual 7 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 310: ...Z580 D Z593 D Z595 D Diesel Z Master Service Manual Form No 492 9188 ...