Lubrication
Greasing Bearings and
Bushings
Service Interval:
Every 100 hours (Lubricate more
frequently in heavy duty applications)
The vehicle has grease fittings that must be lubricated
regularly with No. 2 General Purpose Lithium Base
Grease.
The grease fitting locations and quantities are as follows:
•
Ball joints (4), tie rods (2), pivot mounts (2) and
steering cylinder (2) (Figure 41)
•
Spring tower (2) (Figure 42)
•
Clutch (1), accelerator (1), brake (qty.1) (Figure 43)
•
Accelerator arm (1) (Figure 44)
•
U-joint (18) and 4 wheel drive shaft (3) (Figure 45)
Important:
When greasing the drive shaft universal
shaft bearing crosses, pump grease until it comes
out of all 4 cups at each cross.
1. Wipe each grease fitting clean so foreign matter
cannot be forced into the bearing or bushing.
2. Pump grease into each bearing or bushing.
3. Wipe off excess grease.
Figure 41
Figure 42
Figure 43
40