
Workman HD Series
Page 6 -- 52
Drive Train
34.Install differential lock arm (item 1) onto fork shaft. In-
sert lock pin into fork shaft and arm. Pay attention to
direction of slit in lock pin.
35.Apply silicone sealant to mating surface of upper
cover (item 2). Pay attention to direction of cover and
install. Secure with four (4) flange head screws (item 1).
Torque screws from
18.5 to 22 ft--lb (24.5 to 29.5 N--m)
.
1
Figure 110
1
2
Figure 111
Summary of Contents for Workman HD Series
Page 2: ...Workman HD Series This page is intentionally blank ...
Page 4: ...Workman HD Series This page is intentionally blank ...
Page 6: ...Workman HD Series This page is intentionally blank ...
Page 46: ...Rev A Workman HDX Page 3 28 Briggs Daihatsu Gasoline Engine This page is intentionally blank ...
Page 68: ...Workman HD Page 5 4 Kohler Gasoline Engine This page is intentionally blank ...
Page 95: ...Workman HD Series Page 6 19 Drive Train This page is intentionally blank Drive Train ...
Page 140: ...Workman HD Series Page 6 64 Drive Train This page is intentionally blank ...
Page 155: ...Workman HD Series Page 7 15 Chassis This page is intentionally blank Chassis ...
Page 159: ...Workman HD Series Page 7 19 Chassis This page is intentionally blank Chassis ...
Page 167: ...Workman HD Series Page 7 27 Chassis This page is intentionally blank Chassis ...
Page 216: ...Workman HD Series Page 9 2 Hydraulic System This page is intentionally blank ...
Page 244: ...Workman HD Series Page 9 30 Hydraulic System This page is intentionally blank ...
Page 274: ...Workman HD Series Page 9 60 Hydraulic System This page is intentionally blank ...
Page 296: ...Rev A Workman HDX HDX D Page 10 22 Front Wheel Drive 4WD This page is intentionally blank ...
Page 298: ...Workman HD Series Electrical Drawings Page 11 2 This page is intentionally blank ...
Page 309: ...Page 11 13 This page is intentionally blank ...
Page 310: ...Page 11 14 Front Wire Harness Drawing Workman HD Series All Models 3RD HIGH LOCKOUT SWITCH ...
Page 318: ......