Adjusting the Booms to
Level
The following procedure can be used to adjust the
actuators on the center boom to keep the left and
right booms at level.
1.
Extend the booms to the spray position.
2.
Remove the cotter pin from the pivot pin (
g013780
Figure 99
1.
Actuator
4.
Cotter
2.
Actuator rod
5.
Pin
3.
Boom-pivot pin housing
3.
Lift up on the boom and remove the pin (
), and slowly lower the boom to the ground.
4.
Inspect the pin for any damage, and replace it
if necessary.
5.
Use a wrench on the flat sides of the actuator
rod to immobilize it, then loosen the jam nut to
allow the eyelet rod to be adjusted (
g014220
Figure 100
1.
Flat on the actuator rod
5.
Eyelet adjusted
2.
Jam nut
6.
Eyelet position for
assembly
3.
Eyelet
7.
Jam nut tightened to lock
new position
4.
Jam nut loosened
6.
Turn the eyelet rod in the actuator rod to shorten
or lengthen the extended actuator to the desired
position (
Note:
You must turn the eyelet rod in half or
complete revolutions so that you can assemble
the rod to the boom.
7.
Once the desired position has been achieved,
tighten the jam nut to secure the actuator and
eyelet rod.
8.
Raise the boom to align the pivot with the
actuator rod.
9.
While holding the boom, insert the pin through
both boom pivot and actuator rod (
10.
With the pin in place, release the boom and
secure the pin with the cotter previously
removed.
11.
Repeat the procedure for each actuator rod
bearing, if necessary.
Inspecting the Nylon Pivot
Bushings
Service Interval:
Every 400 hours/Yearly (whichever
comes first)
1.
Park the machine on a level surface, engage the
parking brake, shut off the pump, shut off the
engine, and remove the key.
73
Summary of Contents for 41393
Page 88: ...Schematics g034336 Sprayer System Schematic Rev DWG 131 9559 Rev A 88...
Page 89: ...Notes...
Page 90: ...Notes...