Note:
For easier installation, look down through
the opening in the speed selector (Figure 13).
Figure 13
1.
Speed selector
4
Installing the Chute Control
Rod
Parts needed for this procedure:
2
Carriage bolts
2
Locknuts
Procedure
1. Unwrap the Quick Stick and rotate it so that it is
upright and in the center.
2. Hold the blue trigger cap down and pull the lever
fully rearward.
Note:
The discharge chute and deflector should
face forward. If they do not, hold the blue trigger
cap down (but do not move the Quick Stick) and
rotate the discharge chute until they do.
3. Align the flattened back end of the long chute
control rod with the flattened front end of the short
rod that extends from the control panel so that they
nest together (Figure 14).
Figure 14
1.
Short rod
2.
Long chute control rod
4. Insert the front end of the rod into the opening in
the back of the chute gear cover until it slides into
the chute gear (Figure 15).
Figure 15
5. Align the holes in the nested ends of the rods and
insert 2 carriage bolts (in the loose parts bag) through
the short rod from the left side of the machine (from
the operating position).
6. Insert the cable clip that supports the deflector
cable onto the forward carriage bolt, and secure the
carriage bolts with locknuts from the loose parts bag
(Figure 16).
10
Summary of Contents for 38597
Page 29: ...Notes 29 ...
Page 30: ...Notes 30 ...