SMS-TORK Endüstriyel Otomasyon Ürünleri San. Tic. Ltd. Şti.
2
CONTENT
1. PURPOSE OF DOCUMENT.....................................................................................................................................................4
2. PRODUCT OVERVIEW............................................................................................................................................................4
a. Intended Use of the Product...............................................................................................................................................4
b. Product Coding System.........................................................................................................................................................5
c. Product and Part Pictures......................................................................................................................................................6
d. Labeling Details.............................................................................................................................................................................7
3. PRODUCT OPERATION...........................................................................................................................................................8
a. Storage Conditions.....................................................................................................................................................................8
b. Operation Conditions...............................................................................................................................................................8
c. Protection Measures..................................................................................................................................................................8
d. Options................................................................................................................................................................................................9
4. PRODUCT INSTALLATION...................................................................................................................................................9
a. Actuator Installation to Valve.............................................................................................................................................9
b. Manuel Control...........................................................................................................................................................................12
c. Adjusting Cams and Limit Switches...............................................................................................................................12
d. Technical Dimensions.............................................................................................................................................................13
e. Atex .....................................................................................................................................................................................................13
f. Proportional Control Unit.....................................................................................................................................................14
g. PIU Potentiometer Unit..........................................................................................................................................................15
5. ACTUATOR CONTROL...........................................................................................................................................................16
a. Manual Control with Handwheel......................................................................................................................................16
b. Manuel Control on PCB Card...........................................................................................................................................16
c. Proportional Card Adjustment........................................................................................................................................17
Control Signal Selection........................................................................................................................................................17
Output Signal (Feedback) Selection.............................................................................................................................17
Error Positions.............................................................................................................................................................................17
Summary of Contents for TREA 0060
Page 11: ...www smstork com 11 Figure 6 Mounting the Electric Actuator to the Valve with Bracket ...
Page 22: ...SMS TORK Endüstriyel Otomasyon Ürünleri San Tic Ltd Şti 22 230VAC On Off Wiring Scheme ...
Page 23: ...www smstork com 23 24VDC On Off Wiring Scheme ...
Page 25: ...www smstork com 25 24 VDC OProportional Electric Actuator Wiring Scheme ...
Page 31: ...www smstork com 31 ...
Page 32: ...KUL TREA0080 05 01 2021 Rev 02 EN sms tork SMSTORK www smstork com ...