www.smstork.com
9
d. Options
• Position indicator LEDs
• Proportional Control Unit
• RBA – Rechargeable Battery Unit
• IP68 Working Underwater Conditions (Up to 96 hours at a depth of 10 meters)
• ATEX Certificated Body(
Ex II 2G Ex IIC T4 Gb
)
• LCA Local Control Unit with LCD Screen
• Profibus, profinet, ethernet
• Bluetooth
• Wifi
• GPS
4. PRODUCT INSTALLATION
Before installation, it must be checked if there is any damage on the product and there is
any missing part. If there is any damage or missing part, product must not be accepted.
Before the installation information on the labels and the boxes must be checked. Before
the installation, line voltage and voltage written on the label must be checked if they are
in the same range. Before the installation product’s suitability to the system must be
checked. The working limits stated in the technical specifications should not be exceeded.
Before the installation, the line voltage must be switched OFF. Be careful about during
the installation if anybody can switch it ON. This probability must be prevented and must
be sure about it.
a. Actuator Installation to Valve
Electric actuators are manufactured to be mounted on valves according to ISO5211
standard.
Figure 4.
ISO 5211 Sizes
Summary of Contents for TREA 0060
Page 11: ...www smstork com 11 Figure 6 Mounting the Electric Actuator to the Valve with Bracket ...
Page 22: ...SMS TORK Endüstriyel Otomasyon Ürünleri San Tic Ltd Şti 22 230VAC On Off Wiring Scheme ...
Page 23: ...www smstork com 23 24VDC On Off Wiring Scheme ...
Page 25: ...www smstork com 25 24 VDC OProportional Electric Actuator Wiring Scheme ...
Page 31: ...www smstork com 31 ...
Page 32: ...KUL TREA0080 05 01 2021 Rev 02 EN sms tork SMSTORK www smstork com ...