background image

 

18 

 

 

Maintenance

 

 

Every six months check the following items for proper operation of the unit. 
* Lubricate shafts and gears. 
* Keep opener clean at all times. 
* Check and tighten anchors bolts. 
* Check for loose or corroded wire 
* Ensure the opener is well earthed, and correctly terminated. 
* Always check the Stop/Reverse in case of obstruction function when performing any maintenance. If 
this function can’t be made operable, remove this opener from service until the cause of the malfunction 
is identified and corrected. 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

The  gate  opens,  but 
stops  and  will  not 
return. 

1. Please note the two limit magnets are different: one is N pole and another 
is S pole. Please try to exchange the two magnets. 
2. Please try to exchange the limit switch wires CL (close) and OP (open). 
3. Maybe the magnet was installed in the wrong position so it inducts both 
switches. Adjust the magnets to the correct position refer to the manual. 
4. Check the control board. Replace the control board if necessary. 

The  gate  can  open, 
but fails to close. 

1. Photocell is obstructed. Remove obstruction. 
2.  The  limit  switch  is  failed.  Use  a  jumper  wire  to  short  terminal  4  with 
terminal 3 and 5, and then use a keying device to operate the opener, replace 
the limit switch if the motor could run in both directions. 
3. Check the control board. Replace the control board if necessary. 

Summary of Contents for DK1000

Page 1: ...0a DK1000 S Y T Please read and follow all warnings precautions and instructions before installation and use Never connect the solar panel to the control board directly to charge the battery Periodic...

Page 2: ...allation Overview 6 Installation of the Opener 6 Manual Operation 7 Fit The Rack 8 Installation of the Magnets 9 Connecting of AC Main Power Supply 9 Connecting of the Batteries Solar Panels Solar Con...

Page 3: ...e factory declines all responsibility for any consequences resulting from failure to observe Good Technical Practice when constructing closing structures door gates etc as well as from any deformation...

Page 4: ...table for use The gate should be mounted and moved freely Check that the structure is sufficiently strong and rigid and that its dimensions and weights conform to those listed in the specifications ta...

Page 5: ...4 Parts List Extra Parts Rev 20a...

Page 6: ...TOPENS Store Technical Specifications Features Specifications Model DK1000 S Y T Power supply 110V 120V 60Hz or 220 240V 50Hz Motor voltage 24VDC Absorbed power 350W Gate moving speed 20 cm s 8 in s M...

Page 7: ...ble auto close none 30 60 90 seconds Built in max Motor Running Time MRT for multiple safety protection 90 seconds Reliable electromagnetism limit for easy adjustment Can be equipped with a wide range...

Page 8: ...before pouring concrete Remember that cable conduits have to pass through the hole in the base plate 3 Pour concrete and before it starts to harden check that it is parallel to the gate leaf and perf...

Page 9: ...of rack section on the gear of opener as a temporary support Make rack level and mark the rack s mounting holes four holes for light duty or six holes for heavy duty on the gate 4 Fit the rack by sel...

Page 10: ...The magnets should be 20 30mm away from the Limit Switch Box If it is too near or too far the switches will fail to work Adjust the position of the magnets until the positions of the opening and closi...

Page 11: ...are chosen as the power source Marine or Automotive Type Battery is required The batteries should be waterproof type or be placed in water proof circumstance 3 2 PCS 12VDC batteries can be connected...

Page 12: ...condition and accessories needs which we can calculate the configuration of the solar panel and the batteries Please connect the batteries the solar panels solar controller refer to the following illu...

Page 13: ...button should be wired to the 16 and 17 terminals No matter the polarity The gate operator works alternately by pressing the button open stop close stop open 6 Exit Wand optional The BLACK wire of the...

Page 14: ...pad should be connected into the 17 terminal NOTE Using of the photocell exit wand keypad and external receiver would cause the battery exhausted quickly Big capacity of batteries and big power of sol...

Page 15: ...te the gate opener to run for a complete opening cycle and a complete closing cycle to get the full opening time and the full closing time You would achieve the soft stop in your next opening closing...

Page 16: ...ition to increase the reversing sensitivity Note 1 If the sensitivity setting is too higher the gate will stop or reverses very easy by itself while there is little obstruction or resistance such as s...

Page 17: ...on refer to more details in our TOPENS sliding gate opener manual So it is must program button A with sliding gate opener while you may program either C button or D button with TOPENS swing gate opene...

Page 18: ...wires of the motor from terminal 1 and 2 Connect the wires to 24V battery directly the motor should run and then exchange the wires the motor should run in the opposite direction If the motor runs in...

Page 19: ...se note the two limit magnets are different one is N pole and another is S pole Please try to exchange the two magnets 2 Please try to exchange the limit switch wires CL close and OP open 3 Maybe the...