1. Before Use
23
1.3.4 Turning ON/OFF the Power
When turning the power ON, flip the power switch to the right side.
After the power has been turned ON, the instrument will warm up for 10 minutes, then the zero-
adjustment starts and then measurement starts automatically.
To finish measurement, press the RUN/HOLD switch. The final measurement results of
continuous measurement will be displayed.
・
If it has been 1 year or more since calibration has been performed by TOPCON
TECHNOHOUSE factory, a screen recommending maintenance will be displayed before zero-
adjustment.
Maintenance Recommended Screen Display
☞
「
1.4 Maintenance Recommended Display
」
・
In the REMOTE mode (when dip switch 1 is on the REMOTE side), the screen that is
displayed after the power is turned ON will differ.
☞
「
1.3.2 Connecting a PC
」「
Dip Switch Settings
」
When the power is turned ON and dip switch 8 is on the WRITE side, the following screen is
displayed.
After this screen is displayed, set dip switch 8 to the PROTECT side.
Calibrating
F2.0
ABS
K00
G00
-
0
x=
0.1930
y=
0.4899
L=
3.016E+01
cd/m^2
Memo
Attention
!!
Please
set
the
PROTECT/WRITE
SW
to
the
PROTECT
side.