
Operation Manual
12
4. CHART PANEL CONFIGURATION.
If TCP-2000 Chart Panel is securely installed in its operating position, connect the
power cord to the panel first, then the plug power cord to the power outlet. Chart
Panel will start automatically. Flashing LED in the bottom right corner will
indicate start-up process. The panel requires approximately 30 seconds for
initialization. When the LED stops flashing and turns into green and the welcome
screen is displayed, the Chart Panel is ready to use. Install battery into remote
control unit and enter Configuration MENU to set-up Chart Panel options.
Before you start tests on patient you have to configure TCP-2000
properly. To acquire reliable test results it is necessary to set
proper distance between patient and the Chart Panel. Please refer
to chapter
4.1
.
Configuration MENU
To enter Configuration MENU press ‘
ON/OFF
’ button once, TCP-2000 Chart
Panel will switch to stand-by mode. Then press ‘
F3
’ button, TCP-2000 will display
Configuration MENU. If the Chart Panel is already in stand-by mode, simply press
‘
F3
’ button.
Following options are available:
Pic.3.
Configuration MENU
WARNING !
Summary of Contents for TCP-2000
Page 1: ...USER MANUAL FOR THE TCP 2000 CHART PANEL 40 21122 15 107 02EN Rev 002...
Page 2: ......
Page 50: ...Operation Manual 50...