W W W . T M G I N D U S T R I A L . C O M P 1 9 / 2 0 To l l F r e e : 1 - 8 7 7 - 7 6 1 - 2 8 1 9
Figure 16
Step 11 : Tension the cover on the frame from side to side (figure 17)
After the cover is installed on the roof, insert the plastic pipe (#37) slowly
into the grooves on two ends of the cover (not two sides), and then insert
tension tubes (#14) in the groove on both sides of the cover bottom, Add the
water plug (#25) on the 1st tube (#14) to protect the fabric while the tube is
going through and add the water plug on the last tube also to keep water
away.
Stretch and adjust the cover from left and right, back and forth, to make sure
it is square and centered. Cut the grooves from inner side facing to the ratchet
hardware( #7A), and add tie down straps (#21) to pull the tension tube and tie
the strap to the base.
Evenly adjust the ratchets on both sides of the cover to take wrinkles out and
make the cover flat and smooth. Do not fully tie the cover yet. Leave
adequate strap so that the cover can also be adjusted front to back in next
step.
Parts used in this step.
-
(40) Ratchets (#7A)
-
(2) Top cover tension tube (#14)
-
(40) Tie down straps (#21)
-
(28) Tube clamps (#21A)
-
(4) Tension tube end water plug (#25)
-
(28) Hex bolt (#27)
-
(10) Plastic hose (#37)
-
(8) Connector (#37A)