Figure 7
Repeat above step to put up all other trusses (from 3rd to 6th truss), and connect
all purlins. Now the whole structure is completely up. (refer to figure 8)
Parts used in this step.
-
(36) Roof purlin (#5)
-
(36) Self locking bolt (#28)
-
(32) Strengthened bolt (#29)
Figure 8
Tension cable installation . All cables are diagonally installed on each side
of the interval as figure 9.
Parts used in this step.
-
(14) Sidewall frame steel tension cables (#17)
-
(24) Ridge steel tension cables (#18)
-
(4) Middle truss crossing steel tension cables (#19)
-
(32) Cable connection plate (#22)