2.2 Single Station Injector - Load State Operation
The ProPAC-3 will enter the Load State, on receipt of either of the following:
1.
Permissive input signal. (Typically 1:1 DC input pulse)
2.
Injection request. (Typically 40:1 AC input pulse)
On entering the Load State, the viewed screen will automatically switch from the Idle State screen (Fig. 1)
to the Load State screen (Fig. 2.)
Load State Screen - During Load Event
Fig. 2
X
BATCH CONTROLLER
TITAN PRO PAC-3
Load Additive
Load Product
0.026
40
100.2
Example
: ProPAC-3 programmed as follows:
Product Pulses (1:1 DC)
Product Set (40) - unit will inject every 40 gallons of product loaded
Additive Set (100) - unit will inject 100 cc's of additive, every 40 gallons of product loaded
The
Load Product counter
will increment in accordance with the receipt of the 1:1 product pulses. At 40
gallons product loaded, the Batch counter (upper/right corner of display) will increment from 0.0 to the
value injected (100.2). As the Batch counter increments, the Load Additive counter will increment
accordingly, reflecting the total additive loaded during each product load event. At the end of the product
load event, the Load State screen will display the total additive and total product loaded during the product
load.
The ProPAC-3 will remain in the Load State until:
Authorize Enabled
- The permissive input signal is removed.
Authorize Disabled
- After the last product pulse, the time programmed in the Load Timeout.
Load State Screen - End of Load Event
Fig. 3
X
BATCH CONTROLLER
TITAN PRO PAC-3
Load Additive
Load Product
2.774
4,200
100.2