11
Fig. C
Cylinder Loop
9) Install the SHEAVES with AXLES under the Powerside Runway and route cables. (Refer
to Fig. D)
Fig. D
10) Route the Cable ends through the ends of each Crossbeam over the SLACK SAFETY
PIN by removing the pulley assembly, then to the top of each column. Reinstall pulley
after cable has been routed. Tighten the nut using Hex Nuts and Flat Washers at the
ends of the cable. (See Fig. E)
Crossbeam Pulley Removal
Crossbeam Pulley Re-installation
Summary of Contents for HD4P-12000
Page 27: ...23 LIFT WILL NOT RAISE...
Page 28: ...24 MOTOR WILL NOT RUN...
Page 29: ...25 LIFT WILL NOT STAY UP...
Page 30: ...26 WILL NOT RAISE LOADED LIFT...
Page 31: ...27 LIFT LOWERS SLOWLY OR NOT AT ALL...
Page 32: ...28 8 DIAGRAMS PARTS LIST FIG 1 85...
Page 35: ...31 FIG 4...
Page 36: ...32 FIG 5...
Page 40: ...36...
Page 42: ...NOTES...
Page 43: ...NOTES...