background image

1

1. General Information

These instructions should be read carefully  
and retained for further reference and maintenance.

2. Safety

• Before installation or maintenance, ensure the 

mains supply to the PIR sensor is switched off  
and the circuit supply fuses are removed or the 
circuit breaker turned off.

• It is recommended that a qualified electrician is 

consulted or used for the installation of this PIR 
sensor and install in accordance with the current 
IEE wiring and Building Regulations.

• Check that the total load on the circuit including 

when this PIR sensor is fitted does not exceed the 
rating of the circuit cable, fuse or circuit breaker.

3. Technical Specifications

PIR Light Controller

• Operating Voltage: 230V AC 50 Hz
• This product is of Class ll Construction and must 

not be earthed

• Detection Angle: 180°
• Motion Detection Range:  

Up to 12m distance at a 2.5m mounting height

Summary of Contents for LEDPROFOB

Page 1: ...I n s t a l l a t i o n O p e r a t i n g I n s t r u c t i o n s 2300W PIR Light Controller c w RF Control Model SLB2300RF Black Model SLW2300RF White Model LEDPROFOB RF Remote Fob...

Page 2: ...trician is consulted or used for the installation of this PIR sensor and install in accordance with the current IEE wiring and Building Regulations Check that the total load on the circuit including w...

Page 3: ...nual Override Mode ON OFF operation using RF Remote Fob 6 fobs max Sensor Head Adjustment Pan angle Left right 90 Tilt angle Up 15 Down 60 RF Module RX Receiver RF Frequency 433 92MHz IP55 Rated suita...

Page 4: ...1 2m Total number of fobs usable per PIR 6 Operating Temperature 20 C to 40 C RF Module TX Transmitter RF Frequency 433 72MHz to 434 12MHz IP44 Rated suitable for restricted external applications CE C...

Page 5: ...ee diagram A detailing detection range and direction The light controller is more sensitive to movement ACROSS its field of vision than to movement directly TOWARDS see diagram B Therefore position th...

Page 6: ...isolating switch should be installed to enable the power to be switched ON OFF for maintenance purposes During extreme weather conditions the motion light controller may exhibit unusual behaviour Thi...

Page 7: ...Drill the holes ensuring not to infringe with any gas water pipes or electrical cables that may be hidden below the surface Insert the rawl plugs into the holes 6 6 Pass the 230V 50Hz mains supply an...

Page 8: ...late If using a power screwdriver use the lowest torque setting 6 8 Terminate the cables into the terminal block ensuring correct polarity is observed and that all bare conductors are sleeved See sect...

Page 9: ...Diagram Connect the cables to the terminal block as follows Load Switch Live Brown or Red to L1 Neutral Load Blue or Black to N 230V 50Hz Mains Supply Live Supply Brown or Red to L Neutral Supply Blue...

Page 10: ...rds Adjust the light controller to point in the required direction and angle down to limit forward range as required Set the two adjustment controls on the underside of the unit to the following posit...

Page 11: ...ting Up for Automatic Operation Auto Mode When walk tests are complete the unit can be set into Auto Mode The DELAY TIME ADJUST setting controls how long the unit remains illuminated following activat...

Page 12: ...DUSK control a small amount clockwise pausing to try to get the unit to detect and turn the lights under control ON by moving a hand slowly backwards and forwards across the front of the detector len...

Page 13: ...area respectively Mask the PIR Light controllers lens to suit your installation 10 Accessing Terminals After Installation This may be necessary to add further lighting for instance and the following p...

Page 14: ...PIR light controller is functioning correctly and set forAutomatic Operation Auto Mode before you continue Press the centre button that is located on the bottom of the PIR light controller once do not...

Page 15: ...k OFF again each time between presses You cannot pair a 7th fob If attempted the lamp will flash twice to indicate it has not been paired After the last fob press wait for approximately 30 seconds unt...

Page 16: ...rase all RF Remote Fobs from the PIR Light Controller Press and hold the centre button located on the bottom of the PIR light controller for approximately 5 seconds The lamp will flash 5 times This in...

Page 17: ...t reason The unit may be suffering from false activation Cover the sensor lens completely with black PVC tape This will prevent the sensor from seeing anything If the unit now switches off after the s...

Page 18: ...will not operate at night Refer to section 8 Setting Up for DUSK control adjustment Unit activates during the daytime Refer to section 8 Setting Up for DUSK control adjustment You may not be allowing...

Page 19: ...ll cases For all eligible replacements where agreed by Timeguard the customer is responsible for all shipping postage charges outside of the UK All shipping costs are to be paid in advance before a re...

Page 20: ...For a product brochure please contact Qualified Customer Support Co ordinators will be on line to assist in resolving your query If you experience problems do not immediately return the unit to the st...

Reviews: