TW PTO S426
CONTENTS
24.06.2019
Section
Page No.
INTRODUCTION 1
PURPOSE OF MACHINE 2
MACHINE DIMENSIONS & SPECIFICATIONS 2
PARTS LOCATION DIAGRAMS 3
SAFE WORKING 5
Operator’s Personal Protective Equipment Required 5
Basic Shredding Safety 5
General Safety Matters - Do’s and Dont’s 6
Noise Test 7
OPERATING INSTRUCTIONS 8
Delivery 8
Operator’s Personal Protective Equipment Required 8
Daily Checks Before Starting Tractor 8
Connecting to Tractor 8
PTO Shaft 8
Moving the Shredder 8
Before Using the Shredder 9
Manual Controls 9
Auto Controls 10
Stopping the Shredder 10
Emergency Stopping 10
Starting the Shredder 10
Starting to Shred 10
Discharge Controls 11
Hydraulic Oil Lever Indicator 11
Shredding 11
Blockages 11
SERVICE INSTRUCTIONS 12
Service Schedule 13
Safe Maintenance 14
Checking/Top up Gearbox Oil Level and Oil Change Procedure 14
Service Schedule
14
Change Hydraulic Oil and Filter 15
Safe Lifting of the Shredder 15
Spares 16
Copper Ease Safety Information 16
Check Free Rotation of Drum and Hammers 17
PTO Drive Shaft Maintenance 17
Change Hammers 18
Check Hoses 18
Grease Drum Bearings 19
Tension Drive Belts 19
Grease the Roller Box Slides 20
Grease the Roller Spline and Bearing 20
Grease the Discharge Flange 20
Grease the Main Drive and Pump Drive 20
WARRANTY STATEMENT 21
EC DECLARATION OF CONFORMITY CERTIFICATE 22
IDENTIFICATION PLATE 23
DECALS 24
ELECTRICAL DETAIL 26
HYDRAULIC LAYOUT 27
CIRCUIT DIAGRAM 28
V- BELT TENSIONING TABLE 29
WARRANTY SERVICE CHECK RECORD 30
SERVICE RECORD 31
PARTS LISTS 32
Summary of Contents for TW PTO/S426
Page 1: ...timberwolf uk com INSTRUCTIONMANUAL TW PTO S426 SHREDDER ...
Page 25: ...TW PTO S426 22 45 DECLARATION OF CONFORMITY 24 06 2019 ...
Page 26: ...23 45 IDENTIFICATION PLATE TW PTO S426 24 06 2019 EXAM PLE ...
Page 29: ...26 45 ELECTRICAL PARTS LOCATOR TW PTO S426 24 06 2019 Date Last Modified 27th July 09 ...