ASSEMBLY
Assembly Section 2-3
DRIVESHAFT AND FRONT PUMP MOUNTING
Install driveshaft into the crankshaft adapter.
Slide splined driveshaft coupler onto the pump driveshaft. Install the pump onto the
mounting bracket. NOTE: the pump is offset to one direction and the pump should be
installed with the offset side on top. Install hardware for securing pump to the pump mount,
DO NOT tighten.
Install pump and align so that splined coupling can be moved (FREE PLAY) back and
forth by hand. Rotate coupler and check free play every 1/4 turn. Tighten pump mounting
bolts in succession, rechecking for spline coupling free play. Remove the pump mounting
bracket bolts one at a time and apply a thread locking agent. Tighten these bolts in
succession, again checking for free play in the driveshaft. After all bolts are torqued, the end
play on the driveshaft should be 1/16” to 1/8”, and coupler should move freely with hand
pressure. If end play is less than 1/16”, grind the end of the shaft to achieve the proper end
play. If there is more than 1/4” of end play, return the shaft with specifications for a longer
shaft.
CAUTION: DO NOT START THE TRACTOR UNTIL ALL HOSES ARE ATTACHED,
ADJUSTING REAR WHEELS
Raise rear of tractor onto jack-stands.
Follow the instructions in the tractor owner’s
manual for adjusting tires and rims
. The back wheels MUST be adjusted to the widest
setting. NOTE: This may require switching the wheels to opposite sides of tractor. Also take
note of any width restrictions when transporting by trailer. (For ease of installation, it is best to
leave the rear wheels removed during installation of the mower.)
(ASM-B-0001)
POLYCARBONATE SAFETY WINDOW
NOTE
: Installing a boom mower requires that all right side windows be replaced or
shielded by a lexan safety window. In most cases this should be done before mounting the
mainframe. Carefully remove the existing right side cab windows, to be replaced with the
matching polycarbonate windows provided.
Clean all of the surfaces around the window opening, once the right side windows are
removed. Peel back the protective paper from the area around the window that will contact the
window frame. Apply a bead of urethane window adhesive, supplied in kit, around the window
opening. Carefully position the new window into position. Fill the remainder of the gap around
the window with the adhesive to finish. Be sure to follow the instructions on the adhesive label
when installing window.
Next, install the upper and lower door hinges along with the existing cab door hinges.
To do this, you will remove the existing hinge hardware and install the existing hardware on the
polycarbonate as shown in the Parts Section. Set the safety screen assembly on the hinges and
attach the door to the tractor frame. Install the brackets with the hardware shown in the Parts
Section. Assemble the rod with the vibration isolator and nuts and attach them to the brackets.
Adjust the vibration isolator on the upper and lower brackets to achieve a good fit with the
window.
(ASM-JD-0061)
Summary of Contents for JD6 E Series
Page 4: ......
Page 6: ......
Page 7: ...Safety Section 1 1 2015 Alamo Group Inc SAFETY SECTION ...
Page 25: ...SAFETY BOOM Safety Section 1 19 2015 Alamo Group Inc SAFETY ...
Page 26: ...SAFETY BOOM Safety Section 1 20 2015 Alamo Group Inc SAFETY ...
Page 27: ...SAFETY BOOM Safety Section 1 21 2015 Alamo Group Inc SAFETY ...
Page 28: ...SAFETY BOOM Safety Section 1 22 2015 Alamo Group Inc SAFETY ...
Page 29: ...SAFETY BOOM Safety Section 1 23 2015 Alamo Group Inc SAFETY ...
Page 31: ...Assembly Section 2 1 ASSEMBLY SECTION JD6xxxE BENGAL ...
Page 48: ...ASSEMBLY Assembly Section 2 18 BOOM JOYSTICK DIAGRAM ASM C 0082A ...
Page 56: ...ASSEMBLY Assembly Section 2 26 ...
Page 57: ...Operation Section 3 1 2013 Alamo Group Inc OPERATION SECTION ...
Page 102: ...OPERATION Boom Operation Section 3 46 2013 Alamo Group Inc OPERATION ...
Page 103: ...Maintenance Section 4 1 2015 Alamo Group Inc MAINTENANCE SECTION ...
Page 110: ...MAINTENANCE Boom Maintenance Section 4 8 2015 Alamo Group Inc MAINTENANCE ...
Page 132: ...MAINTENANCE Boom Maintenance Section 4 30 2015 Alamo Group Inc MAINTENANCE ...
Page 134: ...MAINTENANCE Boom Maintenance Section 4 32 2015 Alamo Group Inc MAINTENANCE ...
Page 135: ...PARTS SECTION JD6 BENGAL BOOM ...
Page 137: ...PARTS ORDERING GUIDE 2016 Alamo Group Inc Parts Section 3 JD6XXXE BENGAL ...
Page 138: ...TRACTOR MOUNT KIT 2016 Alamo Group Inc Parts Section 4 JD6XXXE BENGAL ...
Page 142: ...COOLER MOUNT 2016 Alamo Group Inc Parts Section 8 JD6XXXE BENGAL ...
Page 144: ...BOOM MOUNT KIT 2016 Alamo Group Inc Parts Section 10 JD6XXXE BENGAL ...
Page 148: ...JOYSTICK AND SWITCHBOX MOUNT 2016 Alamo Group Inc Parts Section 14 JD6XXXE BENGAL ...
Page 150: ...CABLE MANUAL LIFT VALVE 5 SPOOL 2016 Alamo Group Inc Parts Section 16 JD6XXXE BENGAL ...
Page 152: ...5 SPOOL CABLE CONTROL MOUNT 2016 Alamo Group Inc Parts Section 18 JD6XXXE BENGAL ...
Page 154: ...BATTERY RELOCATION 2016 Alamo Group Inc Parts Section 20 JD6XXXE BENGAL ...
Page 158: ...POLYCARBONATE SAFETY WINDOW 2016 Alamo Group Inc Parts Section 24 JD6XXXE BENGAL ...
Page 160: ...FIRE EXTINGUISHER OPTION 2016 Alamo Group Inc Parts Section 26 JD6XXXE BENGAL ...
Page 162: ...BULKHEAD HYDRAULICS BOOM MOWER 2016 Alamo Group Inc Parts Section 28 JD6XXXE BENGAL ...
Page 164: ...BULKHEAD DIAGRAM 2016 Alamo Group Inc Parts Section 30 JD6XXXE BENGAL ...
Page 166: ...NOTES 2016 Alamo Group Inc Parts Section 32 JD6XXXE BENGAL ...
Page 167: ...PARTS SECTION COMMON BENGAL BOOM T4 ...
Page 168: ...Common Bengal T4 Parts Section NOTES ...
Page 171: ...PARTS ORDERING GUIDE 2015 Alamo Group Inc Parts Section 6 5 COMMON BENGAL T4 ...
Page 172: ...BOOM ASSY BENGAL 18 T4 2015 Alamo Group Inc Parts Section 6 6 COMMON BENGAL T4 ...
Page 174: ...BOOM ASSY BENGAL STANDARD 22 T4 2015 Alamo Group Inc Parts Section 6 8 COMMON BENGAL T4 ...
Page 176: ...BOOM ASSY HYD BENGAL 22 T4 2015 Alamo Group Inc Parts Section 6 10 COMMON BENGAL T4 ...
Page 178: ...BOOM ASSY BENGAL EXT 24 T4 2015 Alamo Group Inc Parts Section 6 12 COMMON BENGAL T4 ...
Page 180: ...BOOM ASSY HYD BENGAL 24 T4 2015 Alamo Group Inc Parts Section 6 14 COMMON BENGAL T4 ...
Page 182: ...BOOMREST OPEN STOW 2015 Alamo Group Inc Parts Section 6 16 COMMON BENGAL T4 ...
Page 192: ...ROTARY MOWER SPINDLE ASSEMBLY 2015 Alamo Group Inc Parts Section 6 26 COMMON BENGAL T4 ...
Page 194: ...BOOM ROTARY PIVOT ASSEMBLY 2015 Alamo Group Inc Parts Section 6 28 COMMON BENGAL T4 ...
Page 196: ...50IN FLAIL DRIVE ASSEMBLY 2015 Alamo Group Inc Parts Section 6 30 COMMON BENGAL T4 ...
Page 202: ...63IN FLAIL DRIVE ASSEMBLY 2015 Alamo Group Inc Parts Section 6 36 COMMON BENGAL T4 ...
Page 204: ...63IN FLAIL MOWER ASSEMBLY 2015 Alamo Group Inc Parts Section 6 38 COMMON BENGAL T4 ...
Page 206: ...BOOM FLAIL PIVOT ASSEMBLY 2015 Alamo Group Inc Parts Section 6 40 COMMON BENGAL T4 ...
Page 213: ...NOTES 2015 Alamo Group Inc Parts Section 6 47 COMMON BENGAL T4 ...
Page 218: ...FRONT HYDRAULIC PUMP 2015 Alamo Group Inc Parts Section 6 52 COMMON BENGAL T4 ...
Page 220: ...50IN AND 60IN ROTARY MOTOR BREAKDOWN 2015 Alamo Group Inc Parts Section 6 54 COMMON BENGAL T4 ...
Page 222: ...FLAIL MOTOR BREAKDOWN 2015 Alamo Group Inc Parts Section 6 56 COMMON BENGAL T4 ...
Page 228: ...MANUAL LIFT VALVE SCHEMATIC 2015 Alamo Group Inc Parts Section 6 62 COMMON BENGAL T4 ...
Page 230: ...ELECTRONIC LIFT VALVE SCHEMATIC 2015 Alamo Group Inc Parts Section 6 64 COMMON BENGAL T4 ...
Page 233: ...BRAKE VALVE HYDRAULIC SCHEMATIC 2015 Alamo Group Inc Parts Section 6 67 COMMON BENGAL T4 ...
Page 234: ...ELECTRICAL TROUBLESHOOTING GUIDE 2015 Alamo Group Inc Parts Section 6 68 COMMON BENGAL T4 ...
Page 235: ...HYDRAULIC TROUBLESHOOTING GUIDE 2015 Alamo Group Inc Parts Section 6 69 COMMON BENGAL T4 ...
Page 236: ...TROUBLESHOOTING 2015 Alamo Group Inc Parts Section 6 70 COMMON BENGAL T4 ...
Page 237: ...TROUBLESHOOTING CONTINUED 2015 Alamo Group Inc Parts Section 6 71 COMMON BENGAL T4 ...
Page 239: ...WARRANTY SECTION Warranty Section 7 1 ...
Page 240: ... ...
Page 244: ...Printed in USA Tiger Corporation ...