2007.03.07
Flow2 stairlift
Tab 04: Install, adjust and release
www.ThyssenKruppAccessibility.nl
7
Preassembly
The landing brackets:
1. Fix the landing bracket (8) to the rail flange (10)
with two Tensilock bolts (9).
2.2
Connecting the rail sections with a section bush
1. Tighten (loosely) the four socket-head screws in the section
bush so that the four nuts are trapped in the slot on the inner
surface.
2. Fit the section bush in the end of a rail section and adjust it to
the correct position.
3. Lock the section bush by tightening the first socket-head bolt
(do not over-tighten).
4. Slide the other rail section over the section bush and make
sure that the two sections mate properly.
5. Position a locking pin in the uppermost hole in the rail section
6. Push the locking pin using a welding clamp or adjustable wrench into the rack
2.3
Installing the feeder cable
1. Pull the two-core supply cable with a cable puller (2) through
the rail section tube.
2. Pull the supply through the opening (1) in the flange for the
charging contacts. Ensure that the length through the rail hole
L is approximately 20 cm.
Fig. 2-3
Fit the landing bracket to the rail
bracket
1
10
8
9
Fig. 2-4
Connect the rail sections
1
Fig. 2-5
Protruding length
of supply cable
L
1
L