MEC 20 MICROPROCESSOR ENGINE/GENERATOR CONTROLLER
PM047 Rev 13 05/03/30
53
Thomson Technology
9.3.5.5.
NO LOAD TEST:
To allow a timed No Load Test of the engine/generator set while using the
AMF control application, a digital input contact from an external timer
must be programmed for NO LOAD Test
(Refer to Section 10.5.8
for
programming details).
The sequence of operation for a No Load Test condition is as follows:
•
With the utility supply normal and the generator stopped, a no load
test sequence may be initiated by closing an external exercise timer
contact to the programmed digital input for No Load Test.
•
Once the external exercise timer contact closes, the engine will start
and come-up to normal operating speed and voltage. The MEC will
issue an alarm of a No Load Test condition. The connected transfer
switch will remain on the utility and the generator will not transfer on
load.
Note
: should the utility supply fail, the generator will
automatically transfer on load.
•
The engine will continue to run as long as the external exercise timer
contact remains closed.
•
Once the external exercise timer contact opens, the engine will
continue to run for its cooldown time as programmed, then it will
automatically stop.
Summary of Contents for MEC 20
Page 2: ......
Page 6: ...MEC 20 MICROPROCESSOR ENGINE GENERATOR CONTROLLER...