![Thomas SAF-T-LINER C2 Maintenance Manual Download Page 17](http://html1.mh-extra.com/html/thomas/saf-t-liner-c2/saf-t-liner-c2_maintenance-manual_1108337017.webp)
Maintenance Operation Procedures and Intervals
Maintenance
Operation No.
Title of Maintenance Operation
Maintenance Intervals
IM
M1
M2
M3
M4
M5
Drag Link Lubricating
•
•
•
•
•
•
Power Steering Motor Lubrication, Electric Vehicle
‡‡‡‡
Power Steering Fluid and Filter Changing, Electric
Vehicle
§§§§
Fuel Tank Band Nut Tightening
•
Fuel/Water Separator Element Replacing
•
Inline Fuel Strainer Replacing
•
•
•
•
Fuel Sender Checking
•
•
•
•
Fuel Tank and Line Inspecting, Propane Engine
•
Fuel Rail Fitting and Injector Inspecting, Propane Engine
•
Fuel Filter Replacing, Propane Engine
•
CNG Fuel System Inspection
•
•
•
•
CNG Fuel Filter Replacement
•
•
•
•
•
CNG Fuel Cylinder Inspection
•
•
•
Exhaust System Inspecting (Noise Emission Control)
•
•
•
•
Battery Voltage Check
•
•
•
•
•
•
Charge Port Inspection, Electric Vehicle
•
•
Ancillary Bay Desiccant Plug Inspection and Replacement,
Electric Vehicle
•
•
•
•
•
Battery Pack Desiccant Replacement, Electric Vehicle
•
•
Door Seals Lubrication
•
•
•
•
•
•
Air Door Inspection
¶¶¶¶
Air Conditioner Inspection
•
•
•
•
•
HVAC Air Filter Cleaning
•
•
General Information
00
Overview of Maintenance Operations: 00–05
Saf-T-Liner C2 School Bus Maintenance Manual, May 2021
00/7
Summary of Contents for SAF-T-LINER C2
Page 2: ......
Page 10: ......
Page 22: ......
Page 26: ......
Page 30: ......
Page 32: ......
Page 36: ......
Page 46: ......
Page 48: ......
Page 52: ......
Page 58: ......
Page 60: ......
Page 68: ......
Page 78: ......
Page 80: ......
Page 84: ......
Page 88: ......
Page 90: ......
Page 94: ......
Page 96: ......
Page 102: ......
Page 104: ......
Page 106: ......
Page 110: ......
Page 128: ......
Page 130: ......
Page 136: ......
Page 148: ......
Page 154: ......
Page 156: ......
Page 164: ......
Page 166: ......
Page 170: ......
Page 174: ......
Page 176: ......