background image

P a g e

 | 

 

17/03/11 

C-TICK 

 
The equipment referred to here complies with requirement of AS/NZS 1044:1995 
electromagnetic interference (EMI). 
 
 
 

INSTALLATION (Refer to Unpacking Page 2) 

 
Place the equipment in a well-ventilated area, on a firm level surface and ensure that 
a suitable power supply is available. Allow sufficient room for the door to open fully. 
 
 

WARNING: 

Ensure that the electrical 

outlet is earthed and is of the correct 
voltage and is capable of carrying the 
equipment stated current load (AMPS). 

 
The models TI-150 (

G

ravity) or (

F

an Forced) are suitable for bench top use, where 

as models TI-250G and F, TI-350F and TI-500F are better suited for floor standing 
due to their height and weight. 
 
 

 

 

 

 

 

CAUTION: 
THE STANDARD 

Range of incubators 

are not suitable for stacking

 
 

MAINTENANCE 
 

The Thermoline range of laboratory incubators require no routine maintenance other 
than normal levels of cleanliness. 
 
The external surface powder coated steel and the inner surface stainless steel may 
be wiped clean using a damp, soft cloth. 
 

CARING FOR STAINLESS STEEL 

Stainless steel is under most conditions extremely resistant to corrosion. This is in 
part due to the addition of chromium and nickel to the steel and the formation of a 
durable chromium oxide at the surface during the manufacturing process. There are 
several chemicals which will attack the surface of stainless steel, plus the lack of 
oxygen at the surface will cause rusting, corrosion and pitting. 

Note: 

Deionised water 

is particularly corrosive, to minimise, maintain a Neutral pH (7-9).  
Always have in place a program of regular cleaning using a soft 

damp

 cloth with a 

mild solution of soap and water and allow to dry.

 

 

TECHNICAL ASSISTANCE 
 

If you require additional operational or technical information regarding this equipment 
please contact: 
 
Thermoline Scientific 
Customer Service Division 
Telephone: 

 61 2 9604 3911 

Facsimile:  

 61 2 9725 1706 

Email: 

[email protected]

 

Summary of Contents for TI-150F

Page 1: ...Scientific Equipment Pty Ltd T A Thermoline Scientific ABN 80 000 859 129 10 12 Ross Place Wetherill Park N S W 2164 Australia P O Box 6862 Wetherill Park Delivery Centre N S W 1851 Australia Phone 0...

Page 2: ...Possibility of damage to the Equipment To maintain safe operation of this equipment be aware of the ALERT BOXES located throughout these operating instructions CONTENTS SAFETY INFORMATION 2 ALERT BOXE...

Page 3: ...ssemble the components and inspect for damage Retain the packaging materials until the equipment has been thoroughly tested Notify the detail of any damage without delay to your supplier or Thermoline...

Page 4: ...viewing products under evaluation whilst not disturbing the conditions is standard in each model Removable chrome plated open wire shelves are supplied with additional shelf spacing The desired opera...

Page 5: ...han normal levels of cleanliness The external surface powder coated steel and the inner surface stainless steel may be wiped clean using a damp soft cloth CARING FOR STAINLESS STEEL Stainless steel is...

Page 6: ...it breaker continues to trip it may indicate an electrical fault exists Switch Off the power and consult a qualified technician TEMPERATURE CONTROLLER SENSOR This is a Eurotherm 3216 PID control with...

Page 7: ...use flammable solvents in this cabinet as fire or explosion may result This cabinet contains components that may ignite such materials WARNING 2 Do not introduce water into this chamber as the excessi...

Page 8: ...the temperature ramps from one temperature at a set rate to a second temperature and then dwells at that temperature for a set period of time This ramp dwell program has 4 ramp dwell segments CHANGING...

Page 9: ...our TGSP 2 40 C RMP 2 5 C hr Dwell at 40 C for 5 hours DWEL 2 5 Ramp from 40 C to 45 C in one hour TGSP 3 45 C RMP 3 5 C hr Dwell at 45 C for 5 hours DWEL 3 5 Ramp from 45 C to 50 C in one hour TGSP 4...

Page 10: ...ters shown below TSP 1 Target set point 1 RMP 1 Ramp rate 1 Note with RMP 1 OFF the temperature will rise from ambient to 35 C as quickly as possible DWEL 1 Dwell time 1 3 As for segment 1 described a...

Page 11: ...ur then dwell there for 5 hours 5 As for segment 3 described above use the Scroll key to select in turn the tsp 4 parameter Target set point 4 the RMP 4 parameter Ramp rate 4 and the DWEL 4 parameter...

Page 12: ...tat This symbol refers to Timer status reset which means that the program or timer is in the reset mode and is not running The status can be Res Run or Hold leave the program in reset mode until after...

Page 13: ...temperature displayed and temperature measured at the centre of the workspace For this reason the digital temperature controls have a parameter that can be used to correct the temperature displayed ca...

Page 14: ...will show PV OFS Use the up or down keys to enter an offset of 1 0 C Use the Home key to return to the original display You will now notice that the 1 0 C calibration has been added to the incubator t...

Page 15: ...warranty service is required Thermoline Scientific will endeavour to have an authorised service organisation carry out the work if there is an available agent however if it is decided to return the e...

Page 16: ...ly by Any defect in material or workmanship of or any other defect whatsoever in or unsuitability for any purpose of the goods or any part of the goods or default or negligence on the part of Thermoli...

Reviews: