The flue gas pipes should be from non-inflammable materials that are suitable and
resistant to combustion products and to their possible condensation.
The chimney connection must be put in the chimney 20mm inwards to prevent any
condensation from the chimney to the boiler. Horizontal parts should have a slope of
at least 3% upwards. The length of the horizontal part should be minimal and not
longer than 2 meters with the ability to clean and remove the accumulated ash. The
chimney connection should be carried out with a maximum of two angles of 90°C.
As flue pipe do not use metal flexible hoses. All parts of the flue pipes
should be safe and replaceable, allowing internal cleansing. Avoid
horizontal deviation.
Summary of Contents for Pelling 100
Page 2: ...2...
Page 17: ...PELLING 17...
Page 18: ...PELLING 18 Clock adjustments Clock adjustments can be done on following way...
Page 20: ...PELLING 20 Flowchart 2 Flowchart 3 Flowchart 4...
Page 37: ...PELLING 37 8 Connection options 8 1 Hydraulic schemes for connection...
Page 38: ...PELLING 38...
Page 39: ...PELLING 39...
Page 40: ...PELLING 40...
Page 43: ...PELLING 43...
Page 47: ...PELLING 47 12 EU Label...
Page 48: ...PELLING 48...
Page 49: ...PELLING 49...