Installation
The commissioning of the system must be carried out by the personnel
authorized by ThermoFLUX d.o.o. or the importer.
The warranty will not be valid if the boiler has not been commisioned by an
authorized servicer.
The first start-up includes the basic operation and maintenance of the boiler. The
service technician authorized for the first commisioning must check the functioning of
the boiler at least durin one complete work cycle.
Risk of material and physical damage due to improper
commissioning. If the first start-up is done by an unprofessional
person, damage to the boiler and the heating system may occur.
7.1
Conditions for installation
The following conditions must be completed before the system is released.
Switch off main power supply.
Check mechanical connections
Check that all components are properly connected.
Check that all mechanical components are securely attached.
Make sure that the burning pot is positioned correctly.
Check hydraulic connections
Check that the circulation pump and the mixing valve are properly connected.
Check that the safety equipment is properly connected.
(It is common that the ’’cold’’ water pressure in the heating system is minimal 1,5 to
maximal 2bars)
7.2
Chimney and pipes for flue gas
The boiler must be connected to the chimney.
The chimney should be calculated
and made according to EN 1384-1. The chimney must be thermally insulated to
prevent condensation.
Flue gas discharge must comply with applicable regulations as regards chimney
dimensions and use of materials for its manufacture. The chimney must have an
opening for cleaning at the lower part.
The internal cross-section of the chimney should not be less than 150mm and the
heights should be at least 5 meters.
Summary of Contents for Pelling 100
Page 2: ...2...
Page 17: ...PELLING 17...
Page 18: ...PELLING 18 Clock adjustments Clock adjustments can be done on following way...
Page 20: ...PELLING 20 Flowchart 2 Flowchart 3 Flowchart 4...
Page 37: ...PELLING 37 8 Connection options 8 1 Hydraulic schemes for connection...
Page 38: ...PELLING 38...
Page 39: ...PELLING 39...
Page 40: ...PELLING 40...
Page 43: ...PELLING 43...
Page 47: ...PELLING 47 12 EU Label...
Page 48: ...PELLING 48...
Page 49: ...PELLING 49...