
PELLING
21
LANGUAGE OPTIONS
Language settings are adjusted by pressing the SET button,and after that by pressing
of button 5 or 6 we choose option
MENU 03-LANGUAGE
.
By pressing of the
SET
button language menu is opened (italian, english, german,
french, croatian...) in which we can choose desired language by pressing button 1 or
2.
When desired language is choosen, confirmation is to be done by pressing button
SET
.
Returning back is done by pressing button 4 (
ON/OFF
)
STAND BY mode
STAND
BY
is used in two ways..
In the case that boiler shuts down because desired temperature is reached
(set
ON
) ,
In the case that boiler modulates when desired temperature is reached (set
OFF
).
Function
STAND BY
can be set
ON
or
OFF
on following way:
STAND BY
mode is activated by pressing button
SET
, and afterwards by
pressing buttons
5
and
6
we choose desired item in the
MENU 04 –
STAND BY MODE
.
By pressing
SET
we are opening options
ON
or
OFF
(choosed by pressing
of buttons
1
or
2
, and confirmed by prissing of button
SET
).
4.3.4.1
STAND BY mode with installed sensor for water temperature
Connection for room thermostat is delivered overbridged, which means that
contact is closed.
A.
FUNCTION STAND-BY SET ON
In the case that function
STAND-BY
is activated (
ON
), boiler will shut down when
desired temperature is reached and above by 2 degrees C, and after 2 minutes of time
pause (set in factory)
TON-WAITING COOLING
is displayed. If temperature do not
decrease below set temperature during 4 (four) minutes, on display is
written TON-
REQUEST WAITING
.
When temperature of the water in boiler is below set temperature by 2 degrees C,
boiler will start again with ignition mode and it will work on set power.
B.
FUNCTION STAND-BY SET OFF
Summary of Contents for Pelling 100
Page 2: ...2...
Page 17: ...PELLING 17...
Page 18: ...PELLING 18 Clock adjustments Clock adjustments can be done on following way...
Page 20: ...PELLING 20 Flowchart 2 Flowchart 3 Flowchart 4...
Page 37: ...PELLING 37 8 Connection options 8 1 Hydraulic schemes for connection...
Page 38: ...PELLING 38...
Page 39: ...PELLING 39...
Page 40: ...PELLING 40...
Page 43: ...PELLING 43...
Page 47: ...PELLING 47 12 EU Label...
Page 48: ...PELLING 48...
Page 49: ...PELLING 49...