10 | Installation
Orion 8010cX Ammonia Analyzer
Ensure that the selected wall on which the instrument is to be
installed can support at least 4 times the weight of the
instrument (about 40KG);
Enough space should be reserved on the right side of the
instrument to facilitate wiring and placing the liquid waste tank
or deionized water tank.
Enough space should also be reserved on the left side of the
instrument to facilitate door opening, tube laying and wiring.
The instrument should be installed at a position with suitable
height. It is suggested that the screen shall be level with the
operator's line of sight.
Remaining level is required for the installation of the
instrument, and it is recommended to use a spirit level for
leveling.
For the schematic diagram of the instrument installation, refer
to
Note:
During installation and operation, when the instrument
door and internal fluid mounting panel are open, there is risk
that the analyzer may fall on its side.
Note:
During the installation of the instrument, especially
when installing external cables, do not discard the rubber
sealing covers on the side of the instrument. External cables
need to pass through these rubber sealing covers to maintain
the integrity of the IP65 enclosure. Schematic Diagram of
on-site instrument installation.
Figure 5. Schematic Diagram of On-site
Installation of Ammonia Analyzer
Note:
This instrument needs to be equipped with two liquid
waste tanks, one containing liquid chemical wastes and the
other containing harmless cleaning liquid wastes. The
corresponding tubes should not be interchanged.
Note:
Deionized water must be a clear, colorless, odorless
and tasteless liquid, (it should not contain ammonia) and its
resistivity is greater than 2 M
Ω
•
cm (megohm
•
cm).
1. Submersible pump
(Equipped by user)
7. Liquid waste tubes
(2 in total)
2. Manually-operated valve
(Equipped by user)
8. Deionized water tube
(1 in total)
3. Flow cell (Optional for
user)
9. Liquid waste tanks (2 in
total, Equipped by user)
4. Water sample injection
tube
10. Deionized water tank
(1, Equipped by user)
5. Ammonia Analyzer
11. Submersible pump
control (Equipped by
user)
6. Power supply socket
(Equipped by user)
12. Electric ball valve
(Equipped by user)