Installation
The Automatic Pressure Control System
To complete the installation of your Automatic Pressure Control System, connect the labeled gas
lines and electrical components.
shows the flow path the gas sample follows as it passes through the Modular Gas System
and FTIR analyzer.
See the plumbing diagram for your system for a more complete flow diagram.
Figure 3-5: The flow path of the sample gas through the Automatic Pressure control configuration
1.
Using the Heated Sample Line (HSL), connect the sample source to the
source to SAMPLE IN.
The sample may pass through the optional probe and heated filter (not shown in
).
2.
Using the Heated Transfer Line (HTL), Connect the SAMPLE TO IGS fitting to the gas
cell inlet.
3.
Connect the gas cell outlet to the inlet of the condensation filter.
4.
Connect the outlet of the condensation filter to the SAMPLE RETURN FROM
FTIR fitting.
5.
Use the short gas line to connect the two fittings labeled number 8 on the Heated
Valve Drawer.
6.
Connect the OUTLET TO PUMP/EDUCTOR fitting to the inlet of the vacuum or
eductor pump.
7.
Connect the outlet of the vacuum pump to the vent or hood.
26
Modular Gas System User Guide
Thermo Scientific
Summary of Contents for FTIR
Page 1: ...Modular Gas System USERGUIDE 269 346401B July 2022 ...
Page 15: ... This page intentionally left blank ...
Page 38: ...using the pressure transducer Thermo Scientific Modular Gas System User Guide 33 Installation ...
Page 61: ... This page intentionally left blank ...
Page 79: ... This page intentionally left blank ...
Page 82: ...Eductor Panel Thermo Scientific Modular Gas System User Guide 77 Plumbing diagrams ...