Benchtop pH/ISE Meter Instruction Manual
Calibration and Measurement of pH
14
B. Electrode Connections
1. Attach electrodes with BNC connectors to sensor input by sliding
connector onto input, pushing down and turning clockwise to lock into
position. Connect reference electrodes with pin tip connectors by
pushing connector straight into reference input.
NOTE: If using a combination electrode with a BNC
connector, a reference electrode is not used.
2. Attach the ATC probe to the ATC jack by sliding the connector
straight on until it is firmly in place. The connector has a special
sealing mechanism, which is engaged, when the connector is
properly attached.
Summary of Contents for 410Aplus
Page 3: ...2 Benchtop pH ISE Meter Instruction Manual...
Page 81: ...80 Benchtop pH ISE Meter Instruction Manual Certificate of Conformity...
Page 89: ...Benchtop pH ISE Meter Instruction Manual Ordering Information 88...
Page 101: ...Benchtop pH ISE Meter Instruction Manual Overview of Meter Functions 420Aplus 710Aplus 100...
Page 117: ...Benchtop pH ISE Meter Instruction Manual Meter Default 116...
Page 119: ...Benchtop pH ISE Meter Instruction Manual Multipoint Calibration Curve 118...
Page 123: ...Benchtop pH ISE Meter Instruction Manual Automatic Blank Correction 122...