![background image](http://html1.mh-extra.com/html/thermo-king/thermolite-401414/thermolite-401414_installation-instructions-manual_1104423009.webp)
TK 56579-11-IS-EN (Rev. A, 10/20)
©2020 Trane Technologies
9
CARRIER™ Installations
IIm
mp
po
orrtta
an
ntt:: BEFORE beginning the installation, refer to
“Solar Panel Installation Best
N
No
otte
e:: Requires Optional Kit 903364 (sold separately) to install.
N
No
otte
e:: The charge controller for the 30W panel is located under the panel. If your controller has
LEDs, verify solar panel operation before securing panel onto unit. If panel is installed,
follow test procedure for non-LED controllers. See
“Solar Panel Test Procedures,” p. 11
.
1. Position solar panel on top of unit as shown with one aluminum spacer under each mounting
hole.
2. Secure panel to the front of the top cover and the rear frame member with the supplied self-
drilling screws.
Figure 11. Aluminum spacers shown installed.
RCS1488
Aluminum spacers and self-drilling screws 4x
3. Route harness down inside the unit and over to the starter.
4. Attach positive (white/red) wire to the positive terminal on the starter solenoid (terminal with
the battery cable attached).
5. Secure the fuse holder to an existing harness.
6. Attach negative (black) wire with terminal ring to the engine block ground stud.
N
No
otte
e:: The black wire with terminal ring should be installed under the flat washer followed by
the large ground cable and the external lock washer last.