2
©2020 Trane Technologies
TK 56579-11-IS-EN (Rev. A, 10/20)
Solar Panel Installation Best Practices
IIm
mp
po
orrtta
an
ntt:: BEFORE beginning the solar panel installation disconnect all power to the
refrigeration unit including standby power (if equipped). Also disconnect all power at
the batteries for solar panel installation onto tractors or buses and on trailers
equipped with a lift gate
•
Prior to installation, familiarize yourself with the components supplied in your kit.
•
Follow installation instructions specific to your installation kit and model refrigeration unit.
•
Plan the solar panel layout and wire routing prior to permanently mounting any components.
•
DO NOT block the solar panel with antennas, telematics modules, etc. This will greatly
reduce the output of the solar panel and inhibit its ability to supply power to maintain and
support the battery or batteries it is connect to.
•
Make sure wire routes are free from abrasive materials and have adequate clearance from
hot surfaces.
•
Holes used for routing harnesses through metal frames, skins or structures should be
smooth and non-marring and lined with a grommet.
•
Remove solar panel fuse (located on the solar panel harness) prior to panel installation.
•
T
Trra
acctto
orr w
wiitth
h A
AP
PU
U – DO NOT connect solar panels to TriPac Envidia APU Batteries.
•
Solar panel electrical harnesses routed inside the refrigeration unit must be secured to other
harnesses or to a solid frame structure with insulated clamps or cable ties to prevent making
contact with rotating or hot components.
•
DO NOT attach electrical harnesses to copper tubing, exhaust components or fuel lines.
•
Solar Panel Test Procedures must be performed to complete the installation.
•
Fill out the Warranty Registration Form after completing the installation.
Figure 2.
DO NOT block the solar panel with antennas, telematics modules, etc.
RCS1634