Refrigeration Service Operations (Rev. 04/02)
80
3.
Solder the inlet and outlet connections. After the valve
cools, install the coil.
4.
Pressurize the refrigeration system and test for leaks.
5.
If no leaks are found, evacuate the system.
6.
Recharge the unit with proper refrigerant and check the
compressor oil.
Summary of Contents for SB-III 30 SR+
Page 4: ......
Page 8: ......
Page 10: ...ii ...
Page 14: ...4 ...
Page 24: ...Unit Description Rev 04 02 14 Unit Photos Front View AGA231 ...
Page 28: ...18 ...
Page 66: ...56 ...
Page 98: ...88 ...
Page 110: ...100 ...
Page 111: ...101 Early Model Coiled Wire Fuse Link Wiring Schematic ...
Page 112: ...102 Early Model Coiled Wire Fuse Link Wiring Diagram Page 1 of 4 ...
Page 113: ...103 Early Model Coiled Wire Fuse Link Wiring Diagram Page 2 of 4 ...
Page 114: ...104 Early Model Coiled Wire Fuse Link Wiring Diagram Page 3 of 4 ...
Page 115: ...105 Early Model Coiled Wire Fuse Link Wiring Diagram Page 4 of 4 ...
Page 116: ...106 Late Model Fuse Link in Battery Cable Wiring Schematic ...
Page 117: ...107 Late Model Fuse Link in Battery Cable Wiring Diagram Page 1 of 4 ...
Page 118: ...108 Late Model Fuse Link in Battery Cable Wiring Diagram Page 2 of 4 ...
Page 119: ...109 Late Model Fuse Link in Battery Cable Wiring Diagram Page 3 of 4 ...
Page 120: ...110 Late Model Fuse Link in Battery Cable Wiring Diagram Page 4 of 4 ...